Services/Upgrades and migrations
Control system upgrades and migrations
Ageing control equipment is a risk to production. We help you plan ahead, then upgrade in stages around your production schedule.
Services/Upgrades and migrations
Ageing control equipment is a risk to production. We help you plan ahead, then upgrade in stages around your production schedule.
An Advanced Engineering Group company
Overview
Control systems often outlive the products they were built from. When a controller, drive or operator panel is no longer made, spares get harder to find and more expensive, and a single failure can stop production for days.
We help you understand where the risks are, plan an upgrade that suits your budget and production, and carry it out in stages. Wherever it makes sense, we keep and reuse what still works.
What’s included
A clear picture of your risks, then a plan you can budget for.
A record of your control hardware and software, with the status and risk of each item.
Options and priorities set out clearly, so you can plan and budget with confidence.
Migration to S7-1500 and TIA Portal, with existing field wiring kept in place wherever possible.
Migration of legacy Rockwell controllers to current controllers.
Replacement of obsolete operator panels, SCADA systems and drives.
Work planned around shutdowns and weekends, with a fallback plan at every stage.
How it works
01
We record what you have, back up the software and assess the risk of each item.
02
Options, priorities and costs, agreed with you.
03
New software converted, improved and tested before site.
04
Installed in planned stages, with as little disruption to production as possible.
Obsolescence
Siemens began phasing out the SIMATIC S7-300 in October 2023, and standard deliveries ended in October 2025. Spare parts will only become harder and more expensive to find. If your plant still depends on S7-300 controllers, now is a good time to plan.
A survey shows exactly which controllers, I/O and panels are affected.
A staged plan lets you upgrade over several shutdowns and budgets.
Existing wiring and equipment reused wherever it is sensible.
It depends on the system, but our aim is always to keep downtime to a minimum. We convert and test the new software before we reach site, and plan the changeover around your shutdowns, often in stages over several weekends or planned stops.
Often, yes. Many migrations keep the field wiring in place, and some keep existing I/O for a first stage. A survey tells us what is possible on your system.
Siemens moved the S7-300 range into its phase-out stage in October 2023 and ended standard deliveries in October 2025. Spare parts are still available for now, but they will become harder to find. A survey will show which parts of your system are affected.
Related services
New software and changes to existing code on Siemens and Rockwell platforms.
Clear operator screens, alarms, trends and a view across the whole plant.
PLC, motor control and drive panels, designed, built and tested to the relevant standards.
Industries we serve
Talk to us
Book a survey. We will tell you where the risks are and what a sensible upgrade plan looks like.