Upgrade before it becomes an emergency

Control systems often outlive the products they were built from. When a controller, drive or operator panel is no longer made, spares get harder to find and more expensive, and a single failure can stop production for days.

We help you understand where the risks are, plan an upgrade that suits your budget and production, and carry it out in stages. Wherever it makes sense, we keep and reuse what still works.

Close-up of PLC input and output modules with connected terminal wiring

What’s included

From survey to changeover

A clear picture of your risks, then a plan you can budget for.

Obsolescence surveys

A record of your control hardware and software, with the status and risk of each item.

Upgrade planning

Options and priorities set out clearly, so you can plan and budget with confidence.

Siemens S7-300 and S7-400

Migration to S7-1500 and TIA Portal, with existing field wiring kept in place wherever possible.

Older Rockwell systems

Migration of legacy Rockwell controllers to current controllers.

HMI, SCADA and drives

Replacement of obsolete operator panels, SCADA systems and drives.

Staged changeovers

Work planned around shutdowns and weekends, with a fallback plan at every stage.

How it works

How an upgrade runs

01

Survey

We record what you have, back up the software and assess the risk of each item.

02

Plan

Options, priorities and costs, agreed with you.

03

Prepare

New software converted, improved and tested before site.

04

Change over

Installed in planned stages, with as little disruption to production as possible.

Obsolescence

Still running Siemens S7-300?

Siemens began phasing out the SIMATIC S7-300 in October 2023, and standard deliveries ended in October 2025. Spare parts will only become harder and more expensive to find. If your plant still depends on S7-300 controllers, now is a good time to plan.

Know where you stand

A survey shows exactly which controllers, I/O and panels are affected.

Spread the work

A staged plan lets you upgrade over several shutdowns and budgets.

Keep what works

Existing wiring and equipment reused wherever it is sensible.

FAQs

Common questions

Anything else? Call +44 (0)1535 655151 or email sales@ae.group.

It depends on the system, but our aim is always to keep downtime to a minimum. We convert and test the new software before we reach site, and plan the changeover around your shutdowns, often in stages over several weekends or planned stops.

Often, yes. Many migrations keep the field wiring in place, and some keep existing I/O for a first stage. A survey tells us what is possible on your system.

Siemens moved the S7-300 range into its phase-out stage in October 2023 and ended standard deliveries in October 2025. Spare parts are still available for now, but they will become harder to find. A survey will show which parts of your system are affected.

Related services

You might also need

Industries we serve

Talk to us

Worried about an ageing control system?

Book a survey. We will tell you where the risks are and what a sensible upgrade plan looks like.

+44 (0)1535 655151 sales@ae.group

Send an enquiry